Collins Park Pavilion – Concrete pad poured

This morning the concrete pad for the Collins Park pavilion was poured by Adirondack Landscaping.

pavilion floor 3 pavilion floor 2 Pavilion floor 1

This entry was posted in Collins Park Pavillion Project. Bookmark the permalink.