Splash Pad Design Update

Spring is here and it’s getting warmer (well slightly warmer).  Updated plans for Lions Splash Pad are complete and it has some new features.  There will be a large 35-foot diameter area and a smaller 15-foot area dedicated to younger children with a concrete surface area of roughly 2000 square-feet.  The smaller area will have less intimidating water jets and will help to physically separate age groups to avoid accidental bumps and bruises.  A foot-activated button in each area concrete will turn the Splash Pad on for 3-5 minutes; the water jets will cycle on and off with some choreography.

The Splash Pad parts are on order and construction should start in late April or early May with a targeted Memorial Day Opening. Donations slowed during the winter and we are hoping to kick back up now that Spring is here.  Donations made by April 30 will be guaranteed your personalized brick is ready by the Grand Opening.